TURNER INTERNATIONAL PROJE YÖNETİMİ LTD ŞTİ

About Us

QUALIFICATIONS AND JOB DESCRIPTION LOOKING FOR FULL TIME QUALITY CONTROL ENGINEER AT OUR ISTANBUL FINANCE CENTER, IN ATASEHIR, ISTANBUL Position Description:  Quality Assurance/ Quality Control Engineer will be employed by Project Management Company. Project Management Company will manage construction and contractors. This QA/QC Engineer will be responsible for ensuring the contractors supervised adhere to construction documents, quality requirements as well as the project-specific Quality Assurance/Quality Control (QA/QC) Plan.   Essential Duties and Responsibilities: Implement project-specific Quality Control Plan. Plan, monitor, document, and report compliance with contract requirements. Develop a comprehensive working knowledge and understanding of the contract documents (including Project Management Company’s contract, project plans, specifications and applicable codes). Develop and execute the project-specific QA/QC Plan with scopes of work and work procedures. Develop method statements for different types of construction works thru contractor, review, ensure compliance with the manager. Develop engineering procedures, including document control, submissions management, creation and tracking of Request For Information (RFIs), material samples, documentation and tracking of potential cost changes. Implement project-specific QA/QC Plan. Lead regularly scheduled Quality Control tracking/update meetings with project staff. Participate in all mock-up installations, reviews and approvals. Create reporting processes and templates to be used by QC team and distributed to Client. Establish the Inspection Request process internally to work with the Client QA and Inspection department.  Establish and maintain working relationships with owners, architects, consultants, subcontractors and vendors to ensure that the project-specific QA/QC Plan delivers a fully compliant project. Understand the project execution plan and coordinate Quality Control procedures at appropriate stages of the work and in line with the project schedule. Continually improve strategies and tools to efficiently and effectively document, track and record compliance with the contract documents. Execute the project-specific QA/QC Plan in a manner that engages all project staff, subcontractors, vendors and consultants. Conduct testing and inspections and arrange for third-party testing and inspections. Analyze and report the results. Expand the development of the Plan as the project progresses as appropriate to expand the program by continually improving procedures. Oversight of the development of punch lists. Oversight of the development of Daily Construction Reports (DCRs). Direct removal and replacement of, and document all non-compliant materials and/or workmanship. Document compliance after corrective work is completed prior to starting any subsequent work. Oversight of project close-out and quality reports. Research and apply additional Quality Control and Lean procedures to enhance the quality of project delivery.Participate in coordination meetings, Foreman’s meetings and Staff meetings * May perform other duties as necessary or assigned.   Qualifications: Min 5-10 years’ experience as a Quality Assurance/Quality Control (QA/QC) Engineer role in the construction industry; high rise; commercial/residential tower experience preferred. Bachelor’s Degree in Civil Engineering, Architecture, Construction Management, Quality Control or related field. Proven track record of meeting production and quality standards in fast-paced construction environments Experience in the areas of hazard identification, safety compliance, and sustainability. Knowledge of the construction process, means and methods, and materials, their characteristics, installation procedures and tolerances. Experience in International projects is preferred. Strong computer skills and knowledge of project management software. Very strong communication skills are required. Proven leadership and skills with the desire to teach and mentor staff.  Required language(s): English verbal & written communication skills preferred. Physical Demands: The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Performance of the required duties will require physical ability to climb permanent and temporary stairs, passenger use of construction personnel hoists, ability to climb ladders and negotiate work areas under construction. Specific vision abilities required by this job include close vision, peripheral vision, depth perception, and the ability to adjust focus. Performing this job requires use of hands to finger, handle, or feel objects, tools or controls, sit, talk and hear, stand, climb, balance, stoop, kneel, crouch, or crawl. Employee must occasionally lift and/or move heavy weight. Work Environment: The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of the job. Reasonable accommodations may be made to enable individuals with disabilities to perform essential functions. While performing the duties of this job, the employee will work on-site at the construction work site where the employee is exposed to moving mechanical parts; high precarious places; fumes or airborne particles; outside weather conditions and risk of electrical shock. The noise in these work environments is usually moderate to very loud. Turner is an Equal Opportunity Employer  VEVRAA Federal Contractor

New Jobs

Quality control qa engineer

Full-time  •  İstanbul,Asya,,Ataşehir,, Turkey  •  4m ago
4m ago
Closed